Overview
Skills
Job Details
One of our clients is urgently looking for an Oracle EBS Migration Specialist.
Scope of Work:
The project involves the end-to-end deployment and migration of Oracle E-Business Suite (EBS) R12.2.10 to Oracle Cloud Infrastructure (OCI), including the integration of Oracle 19c database, cloning, and post-clone validation. The work will be carried out as outlined below, with specific phases, deliverables, and a fixed cost estimate for the core tasks, as well as an hourly rate for additional out-of-scope work.
In-Scope Activities:
Oracle EBS 12.2.10 Installation & 19c Integration on OCI:
Complete setup of Oracle EBS R12.2.10 in Angi’s OCI tenant.
Integration of Oracle 19c database within the EBS environment.
Environment Cloning and Restoration:
Clone environment and restore from IAC tenant using offline media/backup methods.
Reconfiguration of application tiers, database contexts, and concurrent managers.
SSL & URL Setup:
Configuration, validation, and documentation of SSL and URL settings.
Migration Cutover & Post-Go-Live Validation:
Support for migration cutover process.
Validation post-go-live to ensure environment is functioning as expected.
Technical & Infrastructure
- Which Oracle EBS release are we working with (e.g., R12.1.3 or R12.2.x)?
- What Oracle Database version and platform are currently in use?
- Is the EBS setup single-tier or multi-tier (web/app/db split)?
- Are you using a shared filesystem (NFS) or independent app tier installations?
- What is the approximate database size and current storage configuration (block volumes, Object Storage, etc.)?
- Any custom integrations or modules (OAM, SOA, BI Publisher, or 3rd-party apps) that we need to reconfigure post-move?
Migration & Access
- Do we have existing RMAN/Datapump backups or a recent cold backup available from the IAC tenant?
- Will cross-tenant Object Storage access be permitted to transfer backups?
- Is the new OCI tenant network-peered with the IAC tenant, or will connectivity be arranged separately?
- Are there any differences in EBS patching levels or AD/TXK deltas between environments?
- Do you plan to reuse existing EBS URLs and SSL certificates, or will new ones be generated?
Post-Migration & Validation
- Will your internal team handle functional testing, or should it be included in the scope?
- Any dependencies on custom domain names or DNS entries tied to the old tenant?
- What is the expected downtime window or preferred migration strategy (cold clone vs. hot duplicate)?
- Should we also plan for a DR setup or only the production environment migration?
- Are there any data residency or compliance restrictions impacting backup transfer?