Overview
On Site
Depends on Experience
Contract - W2
Contract - 12 Month(s)
Skills
Agile PLM
PDF
Plant Lifecycle Management
Product Lifecycle Management
Testing
Management
SCM
Supply Chain
Quality Assurance
Apache Flex
Job Details
The following requirement is open with our client.
Client : TCS
Title : Teamcenter PLM Consultant
Location : Cupertino, CA (Onsite)
Duration : 12+Months
Visa Status : H1B
Relevant Experience (in Yrs.) : 10+
Detailed Job Description:
- The specific steps involved in structuring Drawings, Cables & BOMs for this project include
- Working with appropriate engineer to understand their design and translate that into the PLM system.
- Use automation tools to help compare structured BOMs with updates.
- Review PDF drawings for projects that have been status to ECOs (Engineering Change Orders).
- Pull any part numbers that are required of the EPS that do not get pulled by the engineer for structure in the BOM.
- Upon approval, the change is integrated into the products design or manufacturing process.
- This step involves updating technical drawings, specifications, manufacturing instructions, and any other relevant documentation.
- After implementation, the modified product or process undergoes testing and validation to ensure that the change effectively addresses the identified issue or improvement without causing any adverse effects.
- Attending appropriate project meetings to gather necessary information to complete tasks accurately and on time.
- Clearly defines the issue or area for improvement that the ECR is addressing.
- Describes the specific change being suggested, including any modifications to designs, specifications, or procedures.
- Provides a detailed explanation of why the change is necessary, highlighting the benefits or drawbacks it may bring.
- Identifies all components, processes, or documentation that will be impacted by the proposed change.
- Assesses the potential costs and resource requirements associated with implementing the change.
- Evaluates the potential impact of the change on various aspects, such as quality, safety, performance, and cost.
- Includes spaces for signatures and approvals from relevant stakeholders, such as engineers, managers, and quality assurance personnel.
- The key components that need to be structured in the BOMs include Board/Flex and Cable BOMs.
- The process for redlining BOMs involves reviewing drawings, working with appropriate engineering DRIs to structure and redline project BOMs
- Reviewing initiated ECOs for accuracy and completeness before submitting.
- The most critical functionalities of the Agile PLM system for this project include reviewing drawings, structuring and redlining BOMs (Bill of Materials),
- Managing ECOs (Engineering Change Orders), and ensuring the accuracy and completeness of ECOs before submission.
- Additionally, the system should support collaboration with engineers and project team members to complete tasks on time and with accuracy.
Must Have Skill:
- Teamcenter
- PLM
- SCM
Employers have access to artificial intelligence language tools (“AI”) that help generate and enhance job descriptions and AI may have been used to create this description. The position description has been reviewed for accuracy and Dice believes it to correctly reflect the job opportunity.