Overview
Skills
Job Details
Title: SAP Production Master Scheduler (MPS) Architect
Location: Remote
Core understanding
Explain A&D Airframer Master Production Scheduling (MPS) Best Practice
Generating Schedule based on formula:
Understanding of generating a schedule for a ModelProgram and range of Tail # s based on RateTakt and Out the Door (OTD) Dates for number of Tail s to be generated during a period.
Generating schedule for a ModelProgram with multiple Assembly Line Production Lines within a Plant with Common Station
Generating schedule for a ModelProgram on an Assembly Line Production Line and incorporating Spares
Generating schedule for an Assembly Line Production Line for Multiple ModelsPrograms
Understanding of MPS integration with Contract Line-Item Numbers (CLIN). Models with range of Tail # s with Entry into Service Dates
Commercial utilization integration to CRM
Defense utilization
Understanding of MPS integration with Engineering. Models with range of Tail # s configuration (Parameter Effectivity)
Understanding of MPS integration with Assembly Processing with Parameter Effectivity
SAP knowledge
S4 Experience
Parameter Effectivity Manufacturing Bill of Material (MBoM)
Parameter Effectivity Operative Network (Network Activities Reference Pointers)
Standard Network (Network Activities Reference Pointers)
ContractSales Orders
Consulting Skills
Requirements gathering
Functional Spec authoring
Process Flows
Functional Unit Testing
Working with Development team