Groton, Connecticut
•
Today
Overview Overview Electric Boat is gearing up to execute a major construction and test program for the 827 Integrated Power Systems (IPS) at the IPS Compatibility Test Facility (CTF) in Philadelphia, PA. The IPS encompasses both the cutting-edge electric drive propulsion plant and the core electrical power distribution system. A pre-production integrated test program utilizing prototypic equipment is currently underway at the CTF and will run continuously right through the launch of the motor
Full-time


