Redmond, Washington
•
Today
Description The project involves the setup of four Data Center Edge Stamps at three specific locations. The Edge Stamps will consist of four network equipment racks, racked network hardware, and supporting cables. The Supplier will unpackage and install all racks, network hardware, and cabling per provided specification General tasks: a. Install, de-install, re-install, and move racks, components, and equipment as required. b. Install patch cables. c. Install blanking panels and brush panels as
Full-time
USD 50.00 - 50.00 per hour



