Denver, Colorado
•
Today
Description Network Planner/Design Data Cleanse Network Element Equipment (Transport and IP equipment) - reconcile Inventory Records with Equipment Logical circuits o Remove 'stranded' cross-connects from equipment o Update Inventory circuit designs and Disconnect 0% Utilized circuits Capacity augmentation and ring configuration completed by CenturyLink o Identify additional capacity needs Migration planning is based on Turn Over Package (TOP) developed by CenturyLink Mid-Range Planner (MRP) o R
Full-time
USD 50.00 - 50.00 per hour












